CASE STUDIES

Ideal Energy Solutions, LLC's customer success stories and examples

PipeRenew® Unplugs a Total Blockage After Only 2 days

Ideal's PipeRenew® treatment unplugs the entiretyof the blockage after 2 days


( read )

Tags: Land, PipeRenew®

PipeRenew® Clears a Complete Flowline Blockage After Other Methods Failed

Ideal's PipeRenew® treatment unplugs flow line blockage,being successful after other methods failed.


( read )

Tags: Land, PipeRenew®

Multiple Pipeline Blockages in Flowline Removed by PipeRenew® Process

Ideal's PipeRenew® treatment removes pipeline blockages in flowline.


( read )

Tags: Land, PipeRenew®

PipeRenew® Treatment Unplugs High Pressure Crude Oil Pipeline

Ideal’s PipeRenew® treatment flushes a historically high pressured crude oil pipeline of over 10bbls of solids.


( read )

Tags: PipeRenew®, Offshore

PipeRenew® Solves Plugging Problem in Eagle Ford Pipeline

Ideal’s PipeRenew® removes paraffin from entire length of 3,900 ft of 4-in. pipeline, along with two stuck pigs, in only nine days


( read )

Tags: Land, PipeRenew®

Subsea Pipeline Blockage Permanently Remediated After PipeRenew® Treatment

Ideal’s PipeRenew® treatment permanently eliminates recurring paraffinand tar blockage in 4.5 in. OD, 26,001 ft subsea pipeline

...

( read )

Tags: PipeRenew®, Offshore

PipeRenew® Removes 768 ft of Paraffin from Louisiana Composite Flowline

In just one day, Ideal’s PipeRenew treatment removes 768 ftof paraffin and restores full flow to 2,450-ft composite flowline


( read )

Tags: Land, PipeRenew®

One Month of Pipe Renew® Flushes High Pressure Offshore Pipe

Ideal’s PipeRenew remediates a 4inch pipeline with abnormally high pressure of over 10 bbls of solids in one month


( read )

Tags: Land, PipeRenew®

Dead Pipeline Restored to Full Flow with PipeRenew®

Ideal’s PipeRenew® restores oil pipeline with no communicationfor more than a month to full flow in only 11 days


( read )

Tags: Land, PipeRenew®

PipeRenew® Fully Restores Completely Plugged Eagle Ford Pipeline

Ideal’s PipeRenew treatment fully restores completely plugged 4-in., 7,600 ft oil pipeline in only 19 days


( read )

Tags: Land, PipeRenew®